At Multisteel we specialise in full major structural steelwork installations small commercial buldings, flats and apartment blocks and house refurbishments, extensions etc, we also manufacture and install mezzanine floors for industrial units. We are also fully skilled in the supply and installation of temporary steel structures whilst building work commences

Below shows a roof top extension to an office block in Nottinghill. This is for a new floor for the word famous photographer Mario Testino, with approx 35 tonne of steel was used.



Below shows a series of pictures shows a temp steel structure holding front and flank walls while rest including floors are removed, plus the basement level of front and flank walls were removed leaving the two walls free standing on our steel frame, approx 130 tonne of steel was used for the temporary frame for this building, the permanent steel installation involved us carrying out full 2d cad plans and section drawings with full 3d model views, with full manufacturing parts list. a total of 28 A1 cad drawings were produced for this contract.








Structural refurbishment converting two properties into one luxury home in London W14

Structural steel cantilever framework for new metal and woodwork facility at Camberwell university of arts

Due to the tight time scale of this construction, this frame was site measured, fabricated and installed in a total of 5 days.

Because of poor access all the steel beams had to be manhandled to installation area and installed without using a crane, the main steel beams weighed almost 1 ton each.